This website uses cookies primarily for visitor analytics. Certain pages will ask you to fill in contact details to receive additional information. On these pages you have the option of having the site log your details for future visits. Indicating you want the site to remember your details will place a cookie on your device. To view our full cookie policy, please click here. You can also view it at any time by going to our Contact Us page.

BROWSE PRODUCTS
 

Sponsored Article

Leighton hospital takes ‘EZ’ path to minimise disruption

Disruption from refurbishment and service upgrades will be minimised at Leighton Hospital in Crewe from now on thanks to the use of an innovative combined cable management and fire stopping system from Cablofil.

Leighton Hospital

The company’s EZ-Path system combines both cable containment and an effective fire barrier for any data communications cabling or low voltage wiring networks. The self-sealing system made up of square section galvanised steel trunking is pre-lined with inert fire stopping materials that expand dramatically in the event of a fire, providing a high integrity barrier against flames, smoke and fumes.

EZ-Path has been installed during a mainly cosmetic upgrade of the main corridors leading to Ward 2 at Leighton Hospital by Checkmate Fire Solutions. While this upgrade did not involve any changes to the electrical services, any future cabling changes would ordinarily require replacement of the fire stopping protection, causing additional dust, disruption and infection control risks. To avoid this, the hospital opted to install Cablofil EZ-Path over the top of the existing cable management installation, enabling them to leave the original services in situ whilst providing capacity for more cables to be installed in the future without the need for any additional fire stopping.


Contact Details and Archive...

Related Articles...

Print this page | E-mail this page

 
Electrical Products